Solid Control Equipment Mud Cleaner for Oilfield Drilling
Basic Info.
Model NO. | GNZJ series |
Type | Desilter |
Working Pressure | 0.25-0.4MPa |
Ex Standard | Exdiibt4 / IEC Ex/ Atex |
Vibration Mode | Linear Motion |
Desander Size | 10 Inch |
Desilter Size | 4 Inch |
Capacity | 120-360m3/H |
Transport Package | Wooden Case |
Origin | China |
HS Code | 84749000 |
Production Capacity | 1000units Per Year |
Product Description
Mud Cleaner is the second stage and the third stagesolids control equipment which is a combination of Desander, Desilter and underflow shaker shaker. Comparing with traditional separate Desander and Desilter, the mud cleaner has a higher cleaning function. The Underflow Screen equals another shaler shaker which receives the waste out from the cyclone nozzle for additional processing. So that mud cleaner could recover more valuable drilling mud. Mud cleaner is the ideal device of the second class and the third class solid control to treat the drilling mud.
1. Desander & Desilter & Shale Shaker 3 in one unit mud cleaner for compact footprint.2. Polyurethane Material hydrocyclone for long life3. Removable hydrocyclone assembly from mud cleaner skid for adjust to be a shale shaker.4. Patent electric shaker deck angle adjustable while working, mechanical deck angle adjustment for backup application.5. Patent tighten rubber sealing for mud cleaner shaker deck and screen for fine screen6. Shaker bottom deck made from Stainless Steel for long service life.7. Heat treatment on complete shaker deck for High G force operation.8. Pretensioned Shaker screen for fast screen replacement.9. Famous Brand Vibration Motors : IEC Ex, ATEX and UL Certified mud cleaner
Mud Cleaner is also called Desander and Desilter assembly. Namely, mud cleaner consists of a two-stage separation process using a combination of hydrocyclones frame mounted over a shale shaker to operate as a single unit. Mud conditioner is effective on processing both weighted and unweighted drilling mud during mud systems in removing and drying solids while retaining the expensive drilling liquid. Used correctly, the drilling mud cleaner would greatly lower both drilling-fluid and disposal costs.
Main technical parameters
Model | GNZJ703F-D1S8NF | GNZJ703F-S2S12NF | GNZJ594F-S2S12NF | GNZJ703F-S3S16NF | GNZJ594F-S3S16NF |
Capacity | 120m3/h(528GPM) | 240m3/h(1056GPM) | 360m3/h(1584GPM) | ||
Desilter Size | 10 inch | ||||
Desilter Qty | 8pcs | 12pcs | 16pcs | ||
Working Pressure | 0.25~0.4Mpa | ||||
Feeding Size | 6 inh | ||||
Output Size | 8 Inch |
Q1. Are you a manufacturer?
Yes, we have manufactured petroleum equipment for over 30 years. They are widely used in worldwide oilfields.
Q2. Do your equipment come with a warranty?
Yes, we have one year warranty.
Q3. Can we customize the equipment from you?
Yes, actually 60% of our products are customized for our clients. You just need to let us know your demand (specifications &drawing is better), and we shall realize them for you.
Q4. How do you deliver your equipment?
By sea or by air.
Q5. What's the lead time for the equipment and its spare parts?
Generally 30-45 days for manufacturing of complete set of equipment. Depending on the quantity, the lead time for spare parts is between 15-20 days.