banner
Products
Highly skilled employees are critical to the company.
Rubber Tension Conveying Green Belt Forming Machine Belt Building Equipment

Rubber Tension Conveying Green Belt Forming Machine Belt Building Equipment

Rubber Tension Conveying Green Belt Building Machine with ISO SGS BV I. Product Profile Tension Conveying Green Belt Bui;
Basic Info.
Model NO. DCS-1600
Delivery Time Within 35 Working Days After Receiving The Deposit
Name Conveyor Belt Vulcanizing Production Line
Transport Package Standard Export Packing
Specification PLC automatic control
Trademark BOJIA
Origin Qingdao, China
HS Code 8477800
Production Capacity 50 Sets Per Month
Product Description

Rubber Tension Conveying Green Belt Building Machine with ISO SGS BV

I. Product Profile
Tension Conveying Green Belt Building Machine production line is mainly used in nylon belt, EP belt, layered cotton canvas belt building and conveying belt rubberzing.
II. Our Machine Advantage
The production line in the building process, The blank in the control of magnetic powder brake, then tension state assembly, the cloth guilding and coiling the wrinkle device ensures the cloth not wrinkle, building operation on both sides of the back and forth; material car can manually adjust the width direction of the position;in the tensioning roller device of the nearby set up an emergency stop button. The rotation speed manual control. All the electrical configuration on the same side, cloth coiling roller can be separated form, the production line can be two round-trip lamination, tensioning roller in middle position of whole line.
III. Technical Parameter

ModelDCS-1000--1400DCS-1400--1800DCS-1800--2200
Maximum width of conveyor belt145018502250
Thickness of conveyor belt3-30mm3-30mm3-30mm
Plying-up layers at most per time3-53-53-5
Maximum diameter of cloth roll900mm1100mm1000mm
Maximum diameter with green roll3000mm3000mm30 00mm
Working mannerReciprocating Reciprocating Reciprocating
Workbench height from the ground820820820
Total size of the machine29-32m30-34m32-37m

IV. Configuration of The Whole Line
-Guide coiling device-Material trolley (belt guide and cloth coiling)-Traction plying-up device-Working platform-Edge press device-Trimming fixed width device-Brushing device-Full set of electrical appliances (Including cables from main electric cabinet to each motor)The configuration could be designed according to the customers' requirements.
V. Picture of The Machine for Reference

Rubber Tension Conveying Green Belt Forming Machine Belt Building Equipment


Rubber Tension Conveying Green Belt Forming Machine Belt Building Equipment


Rubber Tension Conveying Green Belt Forming Machine Belt Building Equipment


Rubber Tension Conveying Green Belt Forming Machine Belt Building Equipment


VI. Testing Running or Inspection Before Shipment

Rubber Tension Conveying Green Belt Forming Machine Belt Building Equipment


VII. Loading Pictures for Reference


If you interested in our products mentioned above, kindly let us know by return email. Then I will supply you with further information. Meanwhile, welcome to visit our factory!VIII. Our ServicesOur engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.In the process of production, we will take photos and send to customers for their track the progress.Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.We supply overseas engineer service and help to train your workers to operate the machine. FAQ 1. Delivery time of the rubber machines?This is specially designed machine according to your specific requirement. From engineer designing to production completion, it needs about 25 to 35 days. 2. What does your factory do regarding quality control? We pay much more importance to quality control from the very beginning to the end of production. Every machine will be fully assembled and carefully tested before shipment. 3. What's the machine quality guarantee?Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition. 4. Are you able to give installation and commissioning overseas? How long time will it take?Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation. Small machine usually takes within 2~3 days. Big plant usually takes about 30 days. 5. How can I trust you to deliver the right machine as I ordered?We will absolutely deliver a good quality machine as we discussed and confirmed in the order.The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us. 6. How can we go to your side?We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.We will pick up you at the airport.

Send inquiry