banner
Products
Highly skilled employees are critical to the company.
Oifield Drilling Fluid Mud Desilter with Competitive Price

Oifield Drilling Fluid Mud Desilter with Competitive Price

Desilter is the third stage solids control and fourth stage drilling mud cleaning equipment in the drilling fluids recyc;
Basic Info.
Type Desilter
Working Pressure 0.25-0.4MPa
Ex Standard Exdiibt4 / IEC Ex/ Atex
Vibration Mode Linear Motion
Desilter Size 4 Inch
Desilter Qty 8-16PCS
Capacity 120-360m3/H
Transport Package Wooden Case
Origin China
HS Code 84749000
Production Capacity 1000units Per Year
Product Description

Desilter is the third stage solids control and fourth stage drilling mud cleaning equipment in the drilling fluids recycling system. Our desilter commonly adapts 4" cyclone which could separate the solid phase particles with size of 15-25 microns. Our desilter is designed 2 options of with and without underflow screen for customers' requirement.

The desilter with underflow shaker is also called Mini cleaner which is applicable for both weighted and unweighted drilling mud, while traditional desander no underflow vibrating screen only for unweighted drilling fluids. And comparing with large size desander and desilter assembly, the Mini Desander is cost-effective. For compact mud system used in HDD, CBM, water well drilling and Mining project, Mini desilter cleaner is an Ideal choice.

Main features of Linear Motion Shale Shaker:
1.Desilter Options with shaker and without shaker for flexible applicaiton.2. Desilter cones with PU material with better Abrasion resistance 3. No under shaker design structure compact and assembly flexible4. Mini desilter cleaner with shaker for both weighted / unweighted mud in various drilling

Desilter is placed after desander but before Decanter Centrifuge. Desilter is also one type equipment to remove the solid particle in drilling through centrifugal force. Desander could remove the much fine solids than desander. During HDD and CBM mud system, the drilling mud after treated by desilter is clean enough for reuse. While in oil & gas drilling, there the mud still needs to be treated by a Decanter Centrifuge.


Main technical parameters
ModelGNZJ752F-8NF/12NFGNZJ703F-D8NF/D12NFGNZJ703F-16NFGNWS-12NF/16NF
Capacity120m3/h(528GPM) / 240m3/h(1056GPM)360m3/h240/360m3/h
Desilter Size4 Inch
Desilter Qty8/12pcs16pcs12/16pcs
Working Pressure0.25~0.4Mpa
Feeding SizeFeeding Size
Output Size8 Inch
Bottom Shale Shaker Specs
Shaker ModelGNZS752FGNZS703F
Vibration ModeLinear Motion
Linear Motion2×0.75Kw2×1.72Kw
Angle Adjust MotorN/A0.55Kw
Screen Qty2pcs2pcs
Screen Size: L×W750×900mm700×1250mm
Screen Area1.35m22.63m2
Adjust G Force≤7.1G≤7.5G
Vibration Amplitude3.92~5.623.92~5.62
Deck Angle Range+2°-1°~+5° (Eletric & Mechanical)
EX StandardExdIIBt4 / IEC EX/ ATEX
Weight (Kg)1057/10971846/18862016504/539
Dimension (mm)1674×1707×17192419×2113×16082419×2113×21262193×900×1511

Oifield Drilling Fluid Mud Desilter with Competitive Price

Oifield Drilling Fluid Mud Desilter with Competitive Price

Q1. Are you a manufacturer?

Yes, we have manufactured petroleum equipment for over 30 years. They are widely used in worldwide oilfields.

Q2. Do your equipment come with a warranty?

Yes, we have one year warranty.

Q3. Can we customize the equipment from you?

Yes, actually 60% of our products are customized for our clients. You just need to let us know your demand (specifications &drawing is better), and we shall realize them for you.

Q4. How do you deliver your equipment?

By sea or by air.

Q5. What's the lead time for the equipment and its spare parts?

Generally 30-45 days for manufacturing of complete set of equipment. Depending on the quantity, the lead time for spare parts is between 15-20 days.


Send inquiry